# CarbonFlow Preflight — Preflight Verification Report

> **Verification Readiness: BLOCKED**  
> 2 critical finding(s) remain open or unverified.  

---

## 1. Executive Summary

- **Run ID**: `run-sample-#4`
- **Project**: Gujarat Solar 100MW Grid Connected Project
- **Monitoring Period**: `period-sample-2023`
- **Methodology**: Sample methodology (sample-rules v0.2)
- **Generated At**: 2026-10-26T05:00:48.294Z
- **Manifest Content Hash (SHA-256)**: `47af7cf2e6f7459f755ab46ad41073dc5b25a3535f306b4c6d15fd2af71489a6`

### Findings Summary

| Category | Total | Open | Resolved / Dismissed |
| :--- | :--- | :--- | :--- |
| **Critical** | 3 | 1 | 1 |
| **Material** | 5 | 4 | 1 |
| **Minor** | 2 | 2 | 0 |

---

## 2. Evidence Documents and Cryptographic Hashes

| Document Name | Format | SHA-256 Digest |
| :--- | :--- | :--- |
| Monitoring_Report_2023.pdf | application/pdf | `a0b2c3d4e5f67890123456789abcdef0123456789abcdef0123456789abcdef0` |
| Meter_Readings_Jan-Dec.xlsx | application/vnd.openxmlformats-officedocument.spreadsheetml.sheet | `a1b2c3d4e5f67890123456789abcdef0123456789abcdef0123456789abcdef1` |
| PPA_Agreement.pdf | application/pdf | `a2b2c3d4e5f67890123456789abcdef0123456789abcdef0123456789abcdef2` |
| Site_Photos.zip | application/zip | `a3b2c3d4e5f67890123456789abcdef0123456789abcdef0123456789abcdef3` |

---

## 3. Findings Register & Human Review Log

### 1. [CALC-001] Net electricity export mismatch
- **Severity**: `CRITICAL`
- **Status**: `OPEN`
- **Detail**: The net electricity exported in the monitoring report (152,345 MWh) does not match the sum of monthly meter readings (149,120 MWh).
- **Remediation**: Reconcile the report total with the monthly meter log and correct whichever figure is wrong.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule CALC-001"

### 2. [DATE-004] Gap in meter data coverage
- **Severity**: `CRITICAL`
- **Status**: `RESOLVED`
- **Detail**: No readings were found for 14 to 19 March 2023. Monitoring periods must be covered without gaps.
- **Remediation**: Attach the missing readings or document the outage with supporting evidence.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule DATE-004"
- **Review Justification**: *Plant maintenance log and grid operator outage memo attached. Verified zero generation during maintenance window.*

### 3. [DOC-002] Calibration certificate expired
- **Severity**: `CRITICAL`
- **Status**: `ACKNOWLEDGED`
- **Detail**: The meter calibration certificate expired on 30 September 2023, before the end of the monitoring period.
- **Remediation**: Provide a valid certificate covering the full period.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule DOC-002"

### 4. [UNIT-003] Unit inconsistency in emission factor
- **Severity**: `MATERIAL`
- **Status**: `OPEN`
- **Detail**: The grid emission factor is reported as 0.82 t/MWh in one table and 820 kg/MWh in another. Values agree once converted.
- **Remediation**: Use one unit across the report and state the conversion.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule UNIT-003"

### 5. [CONS-007] Installed capacity differs between documents
- **Severity**: `MATERIAL`
- **Status**: `OPEN`
- **Detail**: The monitoring report states 100 MW, the PPA states 98.5 MW.
- **Remediation**: Confirm the as-built capacity and align both documents.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule CONS-007"

### 6. [DOC-009] Stakeholder consultation record undated
- **Severity**: `MATERIAL`
- **Status**: `RESOLVED`
- **Detail**: The consultation record does not show a date, so it cannot be tied to the monitoring period.
- **Remediation**: Add the consultation date and signatory.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule DOC-009"
- **Review Justification**: *Reconciled with utility meter records.*

### 7. [PLAU-002] Capacity factor above plausible range
- **Severity**: `MATERIAL`
- **Status**: `OPEN`
- **Detail**: The implied capacity factor is higher than the configured upper bound for this project type. Confirm the generation figure.
- **Remediation**: Check generation data for double counting.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule PLAU-002"

### 8. [DOC-011] Report version not recorded
- **Severity**: `MATERIAL`
- **Status**: `OPEN`
- **Detail**: The monitoring report has no version number or issue date on its cover page.
- **Remediation**: Add document control details.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule DOC-011"

### 9. [FMT-001] Inconsistent date format
- **Severity**: `MINOR`
- **Status**: `OPEN`
- **Detail**: Dates appear as DD/MM/YYYY and YYYY-MM-DD in the same report.
- **Remediation**: Standardize to one format.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule FMT-001"

### 10. [FMT-004] Missing figure caption
- **Severity**: `MINOR`
- **Status**: `OPEN`
- **Detail**: Figure 3 has no caption or source note.
- **Remediation**: Add a caption with the data source.
- **Cited Document Evidence**:
  > "Extracted source evidence matching rule FMT-004"


---

## 4. Legal Disclaimer

> This Preflight Report and Evidence Package is an independent preparedness assessment generated by CarbonFlow Preflight. It is NOT a formal certification, verification, or credit issuance under any carbon standard (e.g. Verra VCS, Gold Standard, UNFCCC, ACR). All findings, reconciliation checks, and readiness determinations are algorithmic and advisory. The project proponent remains solely responsible for the accuracy of all submitted monitoring data and claims.
