Findings
Issues found by rule checks, with citations and audit history.
Net electricity export mismatch
The net electricity exported in the monitoring report (152,345 MWh) does not match the sum of monthly meter readings (149,120 MWh).
Gap in meter data coverage
No readings were found for 14 to 19 March 2023. Monitoring periods must be covered without gaps.
Calibration certificate expired
The meter calibration certificate expired on 30 September 2023, before the end of the monitoring period.
Unit inconsistency in emission factor
The grid emission factor is reported as 0.82 t/MWh in one table and 820 kg/MWh in another. Values agree once converted.
Installed capacity differs between documents
The monitoring report states 100 MW, the PPA states 98.5 MW.
Stakeholder consultation record undated
The consultation record does not show a date, so it cannot be tied to the monitoring period.
Capacity factor above plausible range
The implied capacity factor is higher than the configured upper bound for this project type. Confirm the generation figure.
Report version not recorded
The monitoring report has no version number or issue date on its cover page.
Inconsistent date format
Dates appear as DD/MM/YYYY and YYYY-MM-DD in the same report.
Missing figure caption
Figure 3 has no caption or source note.