Solar Farm – Rajasthan

Grid-connected solar project | AMS-I.D | 2023 – 2024

Page 12 of 24
Project Ref: 2023-SOLAR-094

Annual Monitoring Report – 2023

Monitoring Period: 01 January 2023 – 31 December 2023 • Page 12 of 24

2.4 Electricity Generation

During the verified monitoring period, the project facility maintained continuous grid connection under supervision of the state load dispatch center. Net energy delivered is monitored through calibrated bidirectional revenue meters installed at the project pooling substation.

The total net electricity exported to the grid during the monitoring period is 152,345 MWh.

MonthGross Generation (MWh)Net Export (MWh)
January 202312,14011,820
February 202312,75012,410
March 202314,32013,960
... remaining 9 months detailed in Section 2.4.2 ...

Extracted Evidence

Parameters verified against PDF source

7 fields
Net Electricity Exported
152,345MWh
95%
Source: Page 12
Monitoring Period Start
01 Jan 2023
98%
Source: Page 3
Monitoring Period End
31 Dec 2023
98%
Source: Page 3
Installed Capacity
100MW
71%
Source: Page 5
Grid Emission Factor
0.82tCO2/MWh
93%
Source: Page 14
Transmission Loss Discount
3.5%
89%
Source: Page 8
Specific Fuel Consumption Benchmark
0.32kg/kWh
68%
Source: Page 16