Run #4 – 12 Jun 2024, 14:32
CompletedMethodology: AMS-I.D | Rulepack v1.2 | Engine v0.3.1
Net electricity export mismatch
The net electricity exported (152,345 MWh) does not match the sum of monthly meter readings (149,120 MWh).
Calibration certificate expired during period
The primary substation meter calibration certificate expired on 30 Sep 2023, prior to period completion.
Gap in meter data coverage (14-19 Mar 2023)
No generation records exist for 5 calendar days. Methodology mandates continuous log.
Installed capacity differs between documents
Monitoring report states 100 MW nameplate; PPA schedules indicate 98.5 MW.
Unit inconsistency in emission factor
Emission factor reported as 0.82 tCO2/MWh in Table 3 and 820 kgCO2/MWh in Annex 2.
Stakeholder consultation record undated
Local community consultation memo lacks formal date stamp and signatory validation.
Capacity factor above plausible regional range
Calculated annual capacity factor of 23.8% exceeds regional ceiling benchmark of 22.5%.
Report version control header unpopulated
Cover sheet lacks approved version number and release approval timestamp.
Inconsistent date format across tables
Dates formatted as DD/MM/YYYY and YYYY-MM-DD within same submission package.
Missing figure caption for single-line diagram
Figure 2.1 electrical single-line diagram lacks descriptive caption and source note.